
333 Water rises 31 stories and 342 feet at the corner of North Water Street and St. Paul Avenue, on a former riverfront parking lot at the northern gateway to Milwaukee's Historic Third Ward, a 31-story tower that opened in June 2024.
Developed by Hines and designed by Solomon Cordwell Buenz, with W.E. O'Neil as general contractor, the tower holds 333 apartments ranging from studios to three-bedroom penthouses, with rents among the highest in the city. Its layered facade of brick, precast, metal panel and glass draws on the warehouse character of the Third Ward, while a seven-story screened parking structure along Water Street steps down toward the historic district. Resident amenities are gathered on the eighth floor, including a fitness center, co-working space, lounge and a pool deck that looks onto the restored "Goll & Frank Co." ghost sign on the neighboring Renaissance Building. The ground floor carries about 10,000 square feet of retail and restaurant space, and the project extended the public Milwaukee RiverWalk to the corner of St. Paul and Water, linking it to the Milwaukee Public Market.
Looking back at 333 Water
Opened around Nov 2026, 4 years after breaking ground. 3 milestones on record. Compare it with similar projects from every development in our database.
Nearby and comparables
Within 2 miles of it, nearest first.
0.5 mi awayThe CoutureResidencesJuneau TownOpened 2024View project
0.6 mi awayBaird CenterEntertainmentWestownOpened May 16, 2024View project
0.6 mi awayZenithResidencesEast TownExpected 2029View project
0.7 mi awayAscent MKEResidencesEast TownOpened 2022View project
0.7 mi awayIron District StadiumStadiumWestownAnnouncedView project
0.9 mi awayThe CarolineResidencesPark EastAnnouncedView projectThe projects most like it in its market. Tap one to go head to head.
Companies and contacts
Every firm on 333 Water, the office nearest it, and the people who work on it.
Frequently asked
Where is 333 Water located?
333 Water is located in Milwaukee.
Is 333 Water open?
333 Water is now open. It was completed in June 2024.
Who is developing 333 Water?
Hines is the developer behind 333 Water.
Who designed 333 Water?
333 Water was designed by Solomon Cordwell Buenz.
Who built 333 Water?
333 Water was built by W.E. O'Neil Construction.