The Alatau Complex and Gateway District is Skidmore, Owings and Merrill's landmark quarter for Alatau, the new city rising along the Almaty–Qonaev highway in southeastern Kazakhstan, developed by Alatau City Development Group, a 56-story tower that broke ground in September 2025 and is set to finish in Late 2029.
Two towers define the composition: a 272-metre, 56-story primary tower holding office floors above premium residences, and an 80-metre companion carrying a luxury hotel with its own branded residences. Both are shaped by a "mountain landscape" concept drawn from the Trans-Ili Alatau range on the horizon, their stepped massing terracing back at each level to give nearly every floor an external terrace and to echo the ridgelines behind them. A three-level podium of some 58,000 square metres knits the towers into the street with retail, cultural venues and event space, and the whole complex totals roughly 276,800 square metres. Because the site sits in a seismically active region, the structure combines Japanese damping technology with an American-style reinforced structural frame, an engineering pairing that lets the towers reach landmark height on ground that would otherwise cap them.
Lotte Group said it intends to take part in creating the Iconic Complex after Hotel Lotte Co. and Sensata Invest exchanged memorandums on Lotte hotels in Almaty and Alatau City.
qazinform.comThe National Bank of Kazakhstan said it will launch tokenization of the Iconic Tower complex worth up to $50 million by end-2026 through its regulatory sandbox and KASE infrastructure (Forbes Kazakhstan).
forbes.kzSOM unveiled its Mountain Landscape scheme, a 272m 56-story primary tower and an 80m hotel tower over a three-level podium, drawn from the stratified valleys of the Trans-Ili Alatau range.
som.comChina State Construction Engineering Corporation was entrusted with building the Iconic Towers, a partnership announced during the September 2025 state visit to China.
alatau.city- Event space
Companies and contacts
Every firm on Alatau Complex and Gateway District, the office nearest it, and the people who work on it.
Frequently asked
Where is Alatau Complex and Gateway District located?
Alatau Complex and Gateway District is located in Alatau.
When will Alatau Complex and Gateway District be completed?
Alatau Complex and Gateway District is under construction, with completion expected in Late 2029.
Who is developing Alatau Complex and Gateway District?
Alatau City Development Group is the developer behind Alatau Complex and Gateway District.
Who designed Alatau Complex and Gateway District?
Alatau Complex and Gateway District was designed by Skidmore, Owings & Merrill.
Who is building Alatau Complex and Gateway District?
Alatau Complex and Gateway District is being built by China State Construction Engineering Corporation.