Under Construction

Alida Residences

Alida Residences and the adjacent Tribute Portfolio by Marriott hotel form a roughly 350,000-square-foot transit-oriented development at 506 Datura Street, directly across from West Palm Beach's Brightline station.

TMW IntelligenceVerified Oct 12, 2026
AnnouncedBreaking GroundConstructionOpening SoonNow Open
07.17.26
Start
2028
Completion
112
Keys
181
Units
21
Floors
Scroll for details
Details

506 Datura Street, West Palm Beach. 21 floors, 181 residences and 112 hotel keys. Broke ground July 2026, completing 2028.

The story so far
Announced 2026 est.
Broke ground Jul 17, 2026LD&D and IGEQ broke ground on the 21-storey rental tower beside the Brightline station, alongside a separate 112-key Tribute Portfolio hotel
oftmw.com
Under construction
Expected opening 2028
See the full story with Pro2 more dated, sourced milestones on this project, from announcement to opening.
Start free trial
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
TMW Intelligence

The outlook for Alida Residences

Timing, similar projects and market pressure, read from every development in our database.

The West Palm Beach market 91 · Saturated supplyDowntown West Palm Beach 56-project pipeline · 8,649 residences and keys · peak Late ’28 Explore the market →
Pro tools
Compare projectsSide by side with any projectAnalyze the marketSupply, pricing and timing
About the project

Alida Residences and the adjacent Tribute Portfolio by Marriott hotel form a roughly 350,000-square-foot transit-oriented development at 506 Datura Street, directly across from West Palm Beach's Brightline station. Developed by LD&D and IGEQ with capital partner FrontRange Capital Partners, the project came together over a seven-year process that included assembling three parcels, a rezoning, a pandemic pause and a redesign. The two components are being built simultaneously as distinct properties rather than folded into a single structure, a decision the developers say allowed each to be designed for its own use. Alida Residences rises 21 stories with 181 luxury rental units spanning studios to three-bedrooms from 500 to more than 2,000 square feet, with unobstructed views in three directions and a 21st-floor pool deck that will be downtown's first true rooftop pool on a high-rise multifamily building, overlooking the Intracoastal, The Breakers and the Atlantic. It is the first high-rise multifamily project to break ground downtown since the Laurel, which leased at a record pace and posted some of the highest rents in Florida. The 112-key hotel marks Tribute Portfolio by Marriott's entry into West Palm Beach and the first hotel in the CityPlace neighborhood, surrounded by roughly five million square feet of office space and down the street from Vanderbilt University's future campus. A rezoning increased the site's floor area ratio from 2.75 to 6.5 in exchange for the hospitality component, allowing significantly more housing at the center of the city's transit growth.

Common questions

Frequently asked

Where is Alida Residences located?

Alida Residences is located in West Palm Beach.

When will Alida Residences be completed?

Alida Residences is under construction, with completion expected in 2028.

Who is developing Alida Residences?

LD&D & More is the developer behind Alida Residences.

Who designed Alida Residences?

Alida Residences was designed by Corwil Architects.

How big is Alida Residences?

Alida Residences rises 21 stories with 181 residences and 112 hotel keys.