Under Construction

Concord Sky

Concord Sky rises 300 metres and 85 storeys on the southeast corner of Yonge and Gerrard in Toronto's Garden District, ranking among the city's small handful of supertall towers.

Official Website
TMW IntelligenceVerified Oct 11, 2026
AnnouncedBreaking GroundConstructionOpening SoonNow Open
2021
Start
~10.27
Completion
1407
Units
85
Floors
Scroll for details
Details

383 Yonge Street, Toronto. 85 floors and 1407 residences. Broke ground 2021, targeting October 2027.

The story so far
Announced 2017First proposed 2017 as YSL Residences (Cresford); acquired & rebranded Concord Sky by Concord Adex 2021
en.wikipedia.org
Broke ground 2021Concord Sky construction commenced 2021 (later paused by a 2023 stop-work order, resumed 2024)
en.wikipedia.org
City stop-work order halts tower May 2023Toronto ordered work stopped after the core, load-bearing walls and P5 footings advanced beyond the shoring and foundation permits; work later resumed and vertical construction was underway by 2024
blogto.com
Knife-edge taper begins Jun 2026forming climbed past Concord Sky's repeating base floorplates into the tapering upper tower, with curtain wall glazing and white aluminum cladding following up the 85-storey shaft
urbantoronto.ca
Forming passes the 36th floor as blue glazing chases it up Jul 2026concrete forming at Concord Sky has climbed above the 36th storey of the planned 85, with reflective blue cladding enclosing the tower as high as the 26th floor; completion is most recently scheduled for October 2027
blogto.com
Pointed glazing defines the taper Sep 2026Concord Sky's concrete superstructure has reached about 37 storeys with formwork underway on the 38th, while glazing has climbed to roughly the 27th floor on the west and south elevations above Yonge and Gerrard (UrbanToronto).
urbantoronto.ca
Under construction
Expected opening Oct 2027 est.
See the full story with Pro6 more dated, sourced milestones on this project, from announcement to opening.
Start free trial
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
TMW Intelligence

The outlook for Concord Sky

Timing, similar projects and market pressure, read from every development in our database.

The Toronto market 61 · Elevated supplyGarden District 3-project pipeline · 2,776 residences and keys · peak Late ’27 Explore the market →
Pro tools
Compare projectsSide by side with any projectAnalyze the marketSupply, pricing and timing
About the project

Concord Sky rises 300 metres and 85 storeys on the southeast corner of Yonge and Gerrard in Toronto's Garden District, ranking among the city's small handful of supertall towers. Designed by Kohn Pedersen Fox with architectsAlliance as architect of record and developed by Concord Adex, the tower carries 1,407 residences above a ten-storey mixed-use podium that restores retail frontage along one of Toronto's busiest stretches of Yonge Street. White aluminium cladding and curtain wall wrap a form that tapers as it ascends, giving the tower a distinct profile against the downtown skyline. The location places residents steps from Toronto Metropolitan University, the Eaton Centre, and two subway lines.

Developer & design
Common questions

Frequently asked

Where is Concord Sky located?

Concord Sky is located in Toronto.

When will Concord Sky be completed?

Concord Sky is under construction, with completion expected in October 2027 (a TMW estimate).

Who is developing Concord Sky?

Concord Adex is the developer behind Concord Sky.

Who designed Concord Sky?

Concord Sky was designed by Kohn Pedersen Fox, architectsAlliance.

How big is Concord Sky?

Concord Sky rises 85 stories with 1407 residences.