
The expanded ensemble of the Fondation Beyeler in Riehen, near Basel, pairs Renzo Piano's existing museum with three new buildings by Atelier Peter Zumthor, chosen unanimously from an eleven-practice study competition, at Baselstrasse 101, set to finish in September 2026.
The three-storey Wyss Museum adds 1,500 square metres of exhibition space built from locally sourced Jura limestone, including a rammed facade; the ground-level Ammann Pavilion hosts around 200 to 300 people for concerts, talks and screenings; and the timber-frame Torhaus handles art logistics. Restored 18th-century buildings become art studios, a music salon, an India Mahdavi-designed orangerie and a folly exhibition space, and a previously private 1830s English landscape park is opened to the public, almost doubling the parkland. The ensemble opens gradually from September 26, 2026, with full opening in January 2027, and is financed primarily by the Wyss Foundation of Hansjorg Wyss and the Beyeler-Stiftung.
The outlook for Fondation Beyeler Expansion
Timing and similar projects, read from every development in our database.
Companies and contacts
Every firm on Fondation Beyeler Expansion, the office nearest it, and the people who work on it.
Frequently asked
Where is Fondation Beyeler Expansion located?
Fondation Beyeler Expansion is located in Riehen.
When will Fondation Beyeler Expansion open?
Fondation Beyeler Expansion is opening soon, with completion expected on September 26, 2026.
Who is developing Fondation Beyeler Expansion?
Fondation Beyeler is the developer behind Fondation Beyeler Expansion.
Who designed Fondation Beyeler Expansion?
Fondation Beyeler Expansion was designed by Atelier Peter Zumthor.