Under Construction

Foro Futeca

Guatemala City · Entertainment

Foro Futeca is designed to be Central America's first purpose-built, world-class indoor sports and entertainment forum, the centerpiece of the larger Distrito Futeca masterplan rising on the site of the former Estadio del Ejército in Guatemala City, between Zonas 5 and 10.

Last verified Jul 3, 2026
4.5 yrs to delivery
43%
AnnouncedBreaking GroundConstructionOpening SoonNow Open
04.26
Start
2030
Completion
Scroll for details
The story so far
Announced 2026 est.
Broke ground Apr 22, 2026Distrito Futeca broke ground; US$350M HKS-designed arena district per Revista SUMMA / Guatemala.com
revistasumma.com
Under construction
Expected opening 2030
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
About the project

Foro Futeca is designed to be Central America's first purpose-built, world-class indoor sports and entertainment forum, the centerpiece of the larger Distrito Futeca masterplan rising on the site of the former Estadio del Ejército in Guatemala City, between Zonas 5 and 10. Designed by HKS Architects — the firm behind SoFi Stadium and AT&T Stadium — with local studio AS Arquitectura, the roughly 2.7-million-square-foot arena will seat 21,000 for sporting events in a FIFA-compliant configuration and expand to as many as 35,000 for concerts, beneath a full roof covering both stands and pitch. The venue is engineered to shift between sport, concert, convention and cultural modes, and spans 15 levels, with 10 above-ground levels wrapping the main bowl to hold nightclubs, lounges, offices, coworking spaces, retail, galleries, exhibition halls, an amphitheater and an auditorium. Its organic envelope draws on Guatemala's volcanic landscapes, with interiors ascending from dark, grounded tones at the base to lighter, luminous palettes at the summit, evoking the climb of a volcano. Part of a roughly $350 million, 380,000-square-meter development on a 50-year lease, Foro Futeca anchors an urban masterplan that also includes the Galería Futeca shopping center and a 150-room hotel around a central public plaza. Groundbreaking for the district took place in April 2026; construction of the arena is scheduled to begin in early 2027, with completion targeted for mid-2030.

Developer & design
Journal Coverage
Foro Futeca has been covered in 1 article on Markets of Tomorrow.