Hollywood Burbank Airport Replacement Passenger Terminal in Burbank
Now Open

Hollywood Burbank Airport Replacement Passenger Terminal

Scroll for details
The story so far

Elevate BUR is the $1.3 billion replacement passenger terminal at Hollywood Burbank Airport, replacing facilities dating to 1930, at Winona Avenue and North Hollywood Way, open since October 2026.

The 355,000-square-foot building keeps 14 uniform gates but consolidates everything under one roof: a single ticketing hall, an eight-lane security checkpoint, and an indoor baggage claim with three carousels. A Hollywood-themed design runs through soaring halls with high ceilings, rotating work by local artists, a bar overlooking the airfield, and new dining and shopping after security. The terminal sits farther from the runways for added safety, with a new entrance at Winona Avenue and Hollywood Way and a parking structure of about 2,000 spaces. Corgan and CannonDesign are credited on design, with a Holder, Pankow and TEC team building it in about 33 months. Burbank voters approved the project through Measure B in 2016.

Opened Nov 2026 est.
Announced 2026 est.
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
TMW IntelligenceVerified Nov 19, 2026
AnnouncedBreaking GroundConstructionOpening SoonNow Open

Looking back at Hollywood Burbank Airport Replacement Passenger Terminal

Opened around Nov 2026. Compare it with similar projects from every development in our database.

Pro tools
Compare projectsSide by side with its nearest compsAnalyze the marketModeled pricing, comps and timing

Nearby and comparables

Companies and contacts

Every firm on Hollywood Burbank Airport Replacement Passenger Terminal, the office nearest it, and the people who work on it.

Common questions

Frequently asked

Where is Hollywood Burbank Airport Replacement Passenger Terminal located?

Hollywood Burbank Airport Replacement Passenger Terminal is located in Burbank.

Is Hollywood Burbank Airport Replacement Passenger Terminal open?

Hollywood Burbank Airport Replacement Passenger Terminal is now open. It was completed on October 13, 2026.

Who is developing Hollywood Burbank Airport Replacement Passenger Terminal?

Burbank-Glendale-Pasadena Airport Authority is the developer behind Hollywood Burbank Airport Replacement Passenger Terminal.

Who designed Hollywood Burbank Airport Replacement Passenger Terminal?

Hollywood Burbank Airport Replacement Passenger Terminal was designed by Corgan, CannonDesign.