Announced

Lake Eola Expansion

Lake Eola Park Expansion is a City of Orlando initiative to grow and reconnect the signature downtown park at the heart of Orlando, Florida.

Official Website
~2027
Completion
Scroll for details
Details

205 East Central Boulevard, Orlando. Targeting 2027. Financed with $160M in February 2026.

The story so far
Announced 2026 est.
Turner Construction hired to design the Lake Eola gateway Feb 2026Orlando City Council approved a $3.9 million pre-construction agreement with Turner Construction Company in February 2026 covering the Lake Eola Gateway Entrance and a new pocket park at 30 S. Orange Avenue, a combined project estimated at $18 million and funded through $160 million in downtown tax increment revenue bonds. Turner cannot start construction until a guaranteed maximum price is agreed at a later CRA meeting.
bungalower.com
Financing secured Feb 9, 2026Orlando council + CRA approved $160M in TIF bonds (Feb 9) funding the downtown slate incl. Lake Eola; pre-construction deal with Turner for the Gateway Entrance
redevelopment.net
First phase advances Apr 2026City Council moves to negotiate roughly $30M of Lake Eola Master Plan phase-one upgrades with design-builder Wharton-Smith (amphitheater rear walkway, swan boat dock relocation, stormwater swales) out of a ~$60M plan
theorlandoreal.com
Orlando opens design-build talks for phase one Apr 20, 2026the City Council votes to negotiate with Wharton-Smith on the roughly $30 million first phase, covering a relocated swan boat dock, water-quality work and a walkway behind the amphitheater
theorlandoreal.com
Swans relocated ahead of renovation Jul 2026the city moved Lake Eola's 42 captive swans to a sanctuary after an avian flu outbreak and to protect them during the coming $60 million park renovation
clickorlando.com
Expected groundbreaking 2026 est.
Expected opening 2027 est.
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
TMW IntelligenceVerified Oct 20, 2026
AnnouncedBreaking GroundConstructionOpening SoonNow Open
TMW Intelligence

The outlook for Lake Eola Expansion

Timing and similar projects, read from every development in our database.

The Orlando market 5-project pipelineDowntown Orlando 1,871 residences and keys across the projects in our database Explore the market →
Pro tools
Compare projectsSide by side with any projectAnalyze the marketPricing and timing
About the project

Lake Eola Park Expansion is a City of Orlando initiative to grow and reconnect the signature downtown park at the heart of Orlando, Florida. Funded largely through Community Redevelopment Agency dollars, the plan pairs a new gateway entrance off Rosalind Avenue with a pocket park, opening the lakefront more directly to the surrounding business district. The city assembled adjacent parcels along East Central Boulevard and South Orange Avenue for the gateway, with fresh landscaping and a new fountain intended to strengthen walkability and the connection between downtown and Lake Eola.

Companies and contacts

Every firm on Lake Eola Expansion, the office nearest it, and the people who work on it.

Architect
Common questions

Frequently asked

Where is Lake Eola Expansion located?

Lake Eola Expansion is located in Orlando.

When will Lake Eola Expansion be built?

Lake Eola Expansion is an announced development that has not yet started construction, targeting completion in 2027 (a TMW estimate).

Who is developing Lake Eola Expansion?

City of Orlando is the developer behind Lake Eola Expansion.

Who designed Lake Eola Expansion?

Lake Eola Expansion was designed by CPH Inc..

Who is financing Lake Eola Expansion?

Lake Eola Expansion secured $160M in financing in 02.09.26.