
Palma Del Lago is a gated lakefront community of 37 single-family homes on a peninsula within the Royal Oaks neighborhood of Miami Lakes, on a site of about 17 acres, at NW 162nd Street, under way since October 2024 and targeting 2027.
Developer GT USA offers five floor plans in one- and two-story designs with a choice of architectural elevations, running from roughly 3,000 to 6,000 square feet with three to six bedrooms, open living spaces, lofts, flex rooms and casita options for multi-generational living. Every home faces the water or tree-lined streets, with spacious backyards and two- to three-car garages. Each house is built to GT's Genius program, which includes smart-home technology, upscale finishes and energy-saving features as standard. Buyers choose finishes with in-house design consultants at the builder's Fort Lauderdale design studio. Miami Lakes Main Street, parks and schools are close by, and downtown Miami, Fort Lauderdale and the beaches are about 30 minutes away.
The outlook for Palma Del Lago
Timing and similar projects, read from every development in our database.
How it stacks up
The projects most like it in its market. Tap one to go head to head.
Companies and contacts
Every firm on Palma Del Lago, the office nearest it, and the people who work on it.
Frequently asked
Where is Palma Del Lago located?
Palma Del Lago is located in Miami Lakes.
When will Palma Del Lago be completed?
Palma Del Lago is under construction, with completion expected in 2027 (a TMW estimate).
Who is developing Palma Del Lago?
GT USA is the developer behind Palma Del Lago.
Who is building Palma Del Lago?
Palma Del Lago is being built by Douglas Owens Homes.
How big is Palma Del Lago?
Palma Del Lago features 37 residences.
14 mi away
14 mi away
16 mi away