Under Construction

Burj Azizi

Burj Azizi is a 725-metre megatall rising on Sheikh Zayed Road in the heart of Dubai, developed by Azizi Developments and designed by architecture firm AE7.

Official Website
01.24
Start
~2029
Completion
120
Keys
1047
Units
133
Floors
Scroll for details
Details

Sheikh Zayed Road, Dubai. 133 floors, 1047 residences and 120 hotel keys. Broke ground January 2024, targeting 2029. Financed with $299M in April 2026.

The story so far
Announced 2024 est.
Broke ground Jan 2024
Sales launched Feb 19, 2025Global sales launch at Coca-Cola Arena for the 725m Burj Azizi (residences sales launched)
azizidevelopments.com
Financing secured Apr 2026AED1.1B (~$299M) structural-steel contract awarded to Eversendai for the 725m supertall superstructure; Sheikh Zayed Road, UAE
emilecon.com
Raft foundation complete May 20267,000 cubic metres of concrete poured in just over 40 hours for a five-metre-thick slab, above a nine-level basement reaching roughly 30 metres below grade
meconstructionnews.com
Raft foundation poured over 40 hours May 2026about 7,000 cubic metres of concrete went into the 5m-thick raft slab across roughly 700 truck deliveries, with a nine-level automated basement car park under way.
zawya.com
Under construction
Expected opening 2029 est.
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
TMW IntelligenceVerified Oct 21, 2026
AnnouncedBreaking GroundConstructionOpening SoonNow Open
TMW Intelligence

The outlook for Burj Azizi

Timing and similar projects, read from every development in our database.

The Dubai market 51-project pipelineTrade Centre First 31,763 residences and keys across the projects in our database Explore the market →
Pro tools
Compare projectsSide by side with any projectAnalyze the marketPricing and timing
About the project

Burj Azizi is a 725-metre megatall rising on Sheikh Zayed Road in the heart of Dubai, developed by Azizi Developments and designed by architecture firm AE7. Poised to become the world's second-tallest building after the Burj Khalifa, the roughly 133-storey spire packs a seven-star themed hotel, luxury branded residences, a vertical retail mall and observation levels into a single slender tower. Its engineering-intensive foundations include a five-metre-thick raft slab designed to carry the full structural load, alongside a nine-level automated car park sunk nearly 30 metres below grade. Structural steel for the tower is being fabricated and erected by Eversendai Corporation.

Companies and contacts

Every firm on Burj Azizi, the office nearest it, and the people who work on it.

Architect
Interior design
Common questions

Frequently asked

Where is Burj Azizi located?

Burj Azizi is located in Dubai.

When will Burj Azizi be completed?

Burj Azizi is under construction, with completion expected in 2029 (a TMW estimate).

Who is developing Burj Azizi?

Azizi Developments is the developer behind Burj Azizi.

Who designed Burj Azizi?

Burj Azizi was designed by AE7, with interiors by dsgn.

How big is Burj Azizi?

Burj Azizi rises 133 stories with 1047 residences and 120 hotel keys.