Granger Bay at the V&A Waterfront
Granger Bay is the largest single move the V&A Waterfront has made since the precinct was created, extending Cape Town's waterfront north-west along the shoreline below Signal Hill toward Green Point and the stadium, at Granger Bay Boulevard, under way since 2026 and targeting 2041.
The plan claims roughly 3.2 hectares of new land from Table Bay inside an 11.76-hectare development footprint, built behind a 540-metre seawall and two breakwaters that together take hundreds of thousands of tonnes of rock to place — an engineering exercise on a scale the city has not attempted in generations. Behind that protective arm sits a new sheltered harbour for boating, kayaking and open-water swimming, ringed by luxury retail, new hotels, apartments, restaurants and a continuous public promenade that finally links the existing Waterfront to the Sea Point and Mouille Point coastline. The precinct is being delivered in phases over a long horizon, starting with marine works, basement construction and enabling infrastructure, and is designed to hold the northern edge of a working harbour while giving the public back a stretch of coast that has been fenced off for decades.
The outlook for Granger Bay at the V&A Waterfront
Timing and similar projects, read from every development in our database.
Nearby
Companies and contacts
Every firm on Granger Bay at the V&A Waterfront, the office nearest it, and the people who work on it.
Frequently asked
Where is Granger Bay at the V&A Waterfront located?
Granger Bay at the V&A Waterfront is located in Cape Town.
When will Granger Bay at the V&A Waterfront be completed?
Granger Bay at the V&A Waterfront is under construction, with completion expected in 2041 (a TMW estimate).
Who is developing Granger Bay at the V&A Waterfront?
V&A Waterfront Holdings, Growthpoint Properties is the developer behind Granger Bay at the V&A Waterfront.
0.4 mi away
0.6 mi away