Guangzhou New Airport
Guangzhou New Airport, the Pearl River Delta hub airport, is a major new aviation gateway rising in Gaoming District of Foshan, Guangdong, at the geographic centre of Foshan, Zhaoqing, Jiangmen and Yunfu in the western Greater Bay Area.
4 floors. Broke ground March 2026, completing 2030.
The outlook for Guangzhou New Airport
Timing and similar projects, read from every development in our database.
Guangzhou New Airport, the Pearl River Delta hub airport, is a major new aviation gateway rising in Gaoming District of Foshan, Guangdong, at the geographic centre of Foshan, Zhaoqing, Jiangmen and Yunfu in the western Greater Bay Area. The roughly RMB 41.8 billion project delivers two widely spaced parallel runways, a terminal of about 260,000 square metres designed by the Guangdong Architectural Design & Research Institute with ADPi, and 94 aircraft stands, sized for about 30 million passengers, 500,000 tonnes of cargo and 260,000 flights a year, with high-speed rail links planned through the Zhuhai-Zhaoqing line.
Companies and contacts
Every firm on Guangzhou New Airport, the office nearest it, and the people who work on it.
Frequently asked
Where is Guangzhou New Airport located?
Guangzhou New Airport is located in Foshan.
When will Guangzhou New Airport be completed?
Guangzhou New Airport is under construction, with completion expected in 2030.
Who is developing Guangzhou New Airport?
Guangdong Airport Authority is the developer behind Guangzhou New Airport.
Who designed Guangzhou New Airport?
Guangzhou New Airport was designed by Guangdong Architectural Design & Research Institute, ADPi.
How big is Guangzhou New Airport?
Guangzhou New Airport rises 4 stories.