Under Construction

One West Twelve Residences

Miami · Residences

One West Twelve Residences (ONE W12) is a 23-story, 245-foot residential tower delivering 372 fully furnished and finished residences in the heart of Miami's Historic Overtown — at the crossroads of Park West and the Arts & Entertainment District.

Official Website
Last verified Jun 8, 2026
2.6 yrs to delivery
43%
AnnouncedBreaking GroundConstructionOpening SoonNow Open
10.01.25
Start
2028
Completion
372
Units
23
Floors
Scroll for details
The story so far
Broke groundOct 1, 2025
Under construction
Expected opening2028
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
About the project

One West Twelve Residences (ONE W12) is a 23-story, 245-foot residential tower delivering 372 fully furnished and finished residences in the heart of Miami's Historic Overtown — at the crossroads of Park West and the Arts & Entertainment District. The collection spans studios, one-bedrooms, and a limited group of one-, two-, and three-bedroom townhomes, all approved for short-term rental flexibility. Architecture by CUBE 3 with design by Cotofana Designs draws on the area's cultural and architectural heritage while introducing a modernist, storied glamour to the streetscape. Residences feature integrated kitchens with Miele appliances and Italkraft cabinetry, custom countertops and backsplashes, built-out closets, custom shades, modern bathroom fixtures, and integrated washer/dryer systems. Amenities include a rooftop garden and pool with lounge areas, a state-of-the-art fitness center, curated art installations, smart-building technology, an elegant lobby, and house cruiser bikes with storage. The ground floor will be anchored by Vibe BBQ — a quick-serve restaurant and lounge concept from eight-time James Beard Award winner Marcus Samuelsson, building on the success of his Red Rooster Overtown. Steps from MiamiCentral Station for Brightline and regional transit. Developed by Property Markets Group (PMG) in partnership with Lion Development Group and LNDMRK Development. General contractor John Moriarty & Associates broke ground October 1, 2025; completion anticipated 2028. The project was 97 percent sold at groundbreaking.