Under Construction

Shenzhen Bay Super Headquarters Base

Shenzhen Bay Super Headquarters Base is a waterfront central-business-district masterplan in Shenzhen's Nanshan District, spanning roughly 117 hectares with about 5.2 million square metres of planned floor area.

Official Website
12.25.14
Start
2030
Full build-out
Scroll for details
Details

Broke ground December 2014, full build-out 2030.

The story so far
Announced Sep 2013Shenzhen Bay Super HQ Base district master plan released — ~117ha CBD on reclaimed Nanshan land facing Hong Kong; first groundbreaking Dec 2014.
baike.baidu.com
Broke ground Dec 25, 2014
Topped out Oct 2025Tower C (Zaha Hadid) — both supertalls C1 (394m) and C2 (330m) structurally topped out; connecting steel skybridge completed October 2025; façade installation underway into 2026.
skyscrapercenter.com
Shenzhen Metro breaks ground on its North Tower Nov 15, 2025work starts on the district's landmark transit-linked complex, with basement works due through 2026 and structural topping out targeted for 2028
sznews.com
JD.com's Shenzhen headquarters tops out May 8, 2026the Buro Ole Scheeren-designed Jingscape City reaches 207 metres on its tallest tower and moves into facade and fit-out, with full completion targeted end-2027
finance.sina.com.cn
Tenant announced Sep 19, 2026DJI lands its Intelligent Aviation Systems Global Headquarters in the district: a 249.88-metre, 188,000-square-metre tower, with the planning notice posted for public review 19-28 September
news.qq.com
Expected opening 2030
Pro · Milestones

See the full story

5 more dated, sourced milestonesFrom announcement to opening, each linked to its source.

Start with Pro
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
TMW IntelligenceVerified Oct 17, 2026
AnnouncedBreaking GroundConstructionOpening SoonNow Open
Delivers in phases · 1 component
TMW Intelligence

The outlook for Shenzhen Bay Super Headquarters Base

Timing and similar projects, read from every development in our database.

The Shenzhen market 10-project pipelineNanshan (Shenzhen Bay) 50 residences and keys across the projects in our database Explore the market →
Pro tools
Compare projectsSide by side with any projectAnalyze the marketPricing and timing
About the project

Shenzhen Bay Super Headquarters Base is a waterfront central-business-district masterplan in Shenzhen's Nanshan District, spanning roughly 117 hectares with about 5.2 million square metres of planned floor area. Conceived as a cluster of corporate headquarters towers along Shenzhen Bay, the district is anchored by Zaha Hadid Architects' twin-tower Tower C, whose taller shaft reaches 394 metres and is set to become the tallest building in Nanshan and the third-tallest in Shenzhen. A steel skybridge links the two Tower C shafts, part of a skyline of supertall office, cultural, and mixed-use blocks framing the bay, one of southern China's largest single concentrations of headquarters-grade floor space.

Companies and contacts

Every firm on Shenzhen Bay Super Headquarters Base, the office nearest it, and the people who work on it.

Inside this development
1 direct component.
Common questions

Frequently asked

Where is Shenzhen Bay Super Headquarters Base located?

Shenzhen Bay Super Headquarters Base is located in Shenzhen.

When will Shenzhen Bay Super Headquarters Base be completed?

Shenzhen Bay Super Headquarters Base is under construction, with completion expected in 2030.

How will Shenzhen Bay Super Headquarters Base be built out?

Shenzhen Bay Super Headquarters Base is a phased, multi-component development with 1 tracked component delivering on a rolling schedule. Full build-out is expected in 2030.

Who is developing Shenzhen Bay Super Headquarters Base?

Shenzhen Municipal Government is the developer behind Shenzhen Bay Super Headquarters Base.

Who designed Shenzhen Bay Super Headquarters Base?

Shenzhen Bay Super Headquarters Base was designed by Skidmore, Owings & Merrill.