Under Construction

The Margin District

Scroll for details
The story so far

The Margin District, developed by NAI Nashville Stanton Group and owned by Arlington Family Offices, spans the 700 and 800 blocks of Columbia Avenue within walking distance of the Downtown Franklin Historic District, at 805 Columbia Avenue with 24 residences, set to finish in 2028.

It brings 23 luxury condominiums of roughly 2,000 to more than 3,000 square feet plus a 5,737-square-foot Flagship Residence, about 50,000 square feet of street-level retail and dining and 50,000 square feet of office space, and restores the former Handy Hardware building. Studio 8 Design is lead architect, Nequette Architecture & Design is residential architect and American Constructors is general contractor.

Expected opening 2028
Under construction Nov 2026 est.
Announced 2026 est.
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
TMW IntelligenceVerified Nov 5, 2026
AnnouncedBreaking GroundConstructionOpening SoonNow Open

The outlook for The Margin District

Timing and similar projects, read from every development in our database.

Pro tools
Compare projectsSide by side with its nearest compsAnalyze the marketModeled pricing, comps and timing

Companies and contacts

Every firm on The Margin District, the office nearest it, and the people who work on it.

Common questions

Frequently asked

Where is The Margin District located?

The Margin District is located in Franklin.

When will The Margin District be completed?

The Margin District is under construction, with completion expected in 2028.

Who is developing The Margin District?

NAI Nashville Stanton Group is the developer behind The Margin District.

Who designed The Margin District?

The Margin District was designed by Studio 8 Design, Nequette Architecture & Design.

Who is building The Margin District?

The Margin District is being built by American Constructors.