Under Construction

TRUNK (HOTEL) Dogenzaka

TRUNK (HOTEL) Dogenzaka is a luxury boutique hotel taking shape in the Dogenzaka 2-chome South redevelopment, an eight-tenths-of-a-hectare block reshaping the slope above Shibuya Station in Tokyo.

TMW IntelligenceVerified Oct 9, 2026
AnnouncedBreaking GroundConstructionOpening SoonNow Open
01.16.24
Start
2027
Completion
11
Floors
Scroll for details
Details

Dogenzaka 2-chome, Tokyo. 11 floors. Broke ground January 2024, completing 2027.

The story so far
Announced 2024 est.
Broke ground Jan 16, 2024
Under construction
Expected opening 2027
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
Supply pressure 36 · BalancedTokyo marketMarket →
Compare projectsAnalyze the market
About the project

TRUNK (HOTEL) Dogenzaka is a luxury boutique hotel taking shape in the Dogenzaka 2-chome South redevelopment, an eight-tenths-of-a-hectare block reshaping the slope above Shibuya Station in Tokyo. The eleven-storey, roughly 60-metre hotel building sits alongside a 155-metre, 30-storey office tower, together delivering about 87,100 square metres of new floor space linked directly to the Keio Inokashira Line concourse. The hotel carries roughly 120 to 130 guest rooms and leans into rooftop life: one of the largest rooftop pools in the area, a rooftop restaurant and bar looking out over the Shibuya scramble, and a spa built around wellness programming. At street level the scheme opens an 850-square-metre plaza and a 50-metre greenway stitching Dogenzaka 1-chome to 2-chome, giving one of Tokyo's most congested nightlife slopes a piece of genuine public realm. It extends the TRUNK philosophy of socialising hospitality into Shibuya's most contested address.

The Tokyo market 36 · Balanced supplyDogenzaka 16-project pipeline · 5,213 residences and keys · peak Late ’28 Explore the market →
Common questions

Frequently asked

Where is TRUNK (HOTEL) Dogenzaka located?

TRUNK (HOTEL) Dogenzaka is located in Tokyo.

When will TRUNK (HOTEL) Dogenzaka be completed?

TRUNK (HOTEL) Dogenzaka is under construction, with completion expected in 2027.

Who is developing TRUNK (HOTEL) Dogenzaka?

Mitsubishi Estate, Take and Give Needs is the developer behind TRUNK (HOTEL) Dogenzaka.

Who designed TRUNK (HOTEL) Dogenzaka?

TRUNK (HOTEL) Dogenzaka was designed by Mitsubishi Jisho Sekkei.

How big is TRUNK (HOTEL) Dogenzaka?

TRUNK (HOTEL) Dogenzaka rises 11 stories.