Water Club St. Pete Beach
Kolter Urban's 129-unit waterfront condominium of two eight-story buildings at the east end of Corey Avenue on Boca Ciega Bay, formerly approved as Corey Landing, a 8-story building at 73 75th Avenue that breaks ground in 2027.
The outlook for Water Club St. Pete Beach
Timing and similar projects, read from every development in our database.
Nearby and comparables
Within 2 miles of it, nearest first.
0.2 mi awayCorey LandingResidencesCorey AvenueAnnouncedView project
1.0 mi awayTradeWinds Island Resorts ExpansionHotelBahia ShoresExpected 2043View project
1.2 mi awaySirata Beach Resort ExpansionHotelSt. Pete BeachAnnouncedView project
1.4 mi away4980 Gulf BoulevardHotelSt. Pete BeachExpected 2028View projectThe projects most like it in its market. Tap one to go head to head.
Companies and contacts
Every firm on Water Club St. Pete Beach, the office nearest it, and the people who work on it.
Frequently asked
Where is Water Club St. Pete Beach located?
Water Club St. Pete Beach is located in St. Pete Beach.
When will Water Club St. Pete Beach be built?
Water Club St. Pete Beach is an announced development that has not yet started construction.
Who is developing Water Club St. Pete Beach?
Kolter Urban is the developer behind Water Club St. Pete Beach.
Who designed Water Club St. Pete Beach?
Water Club St. Pete Beach was designed by GROH Architecture.
How big is Water Club St. Pete Beach?
Water Club St. Pete Beach rises 8 stories with 129 residences.
16 mi away
31 mi away