Concepto Taller De Arquitectura

Design firm with 1 project in our database across 1 market.

1
Tracked
0
Announced
1
Under Construction
0
Opening Soon
0
Recently Opened
Featured projects

All 1 we’re watching

Most active markets

Miami
1 project

Frequent collaborators

TMW Intelligence

Ask anything about Concepto Taller De Arquitectura.

Try: what's breaking ground in 2026? tallest tower in pipeline most active city

Concepto Taller De Arquitectura on Markets of Tomorrow

We track 1 design firm project by Concepto Taller De Arquitectura — 1 under construction. Most active markets: Miami (1). Specializing in: Mixed-Use (1).

How we built this list

Every project on this page is from our live database of new and under-construction developments worldwide. We add a project only after we can confirm it from a public filing, an official announcement, or independent reporting; status changes (breaking ground, topping out, opening) are sourced the same way and timestamped. Pro members get full access to TMW Intelligence’s prediction modeling, Dashboard data compilation, Pulse notifications, personalized notifications, comparison view, watchlists, and more.

By the numbers

The scale of the pipeline

110
Total residential units
across 1 project with unit data
8 floors
Tallest in pipeline
Meliá Residences Miami, Miami
8.0 floors
Avg height
mean of 1 known
2027
Delivery window
all projects same year
Where they're active

Markets Concepto Taller De Arquitectura is shaping

TMW Intelligence
Projected pricing at delivery
Meliá Residences Miami
Miami · Coming Q4 2027 · Mixed-Use
TMW Projection
$1,850 / sq ft at delivery
Projected band $1,600 – $2,100 — modeled from 6 comparable launches nearby.
Sales launchTodayDelivery Q4 2027
Projected median
Confidence band
Today

Comparable set — basis for projection

Comparable launch1.2 mi
$1,850
Comparable launch1.2 mi
$1,850
Comparable launch1.2 mi
$1,850
Confidence: High · 6 comps · projections are modeled estimates, never listings
Pro · TMW Intelligence

Projection values are Pro

The model, comps and band unlock instantly.

Unlock with Pro
Scenario outlook
Meliá Residences Miami
Miami · Coming Q4 2027 · Mixed-Use
TMW Projection
Projected price / sq ft
$1,850
at delivery, base case
Sell-out timeline
18months
from sales launch to final close
Absorption pace
4.5units / mo
modeled from the comp set

Scenario assumptions

Fed rate pathGradual cuts
Luxury demandSteady
Comp appreciation+6% / yr
Scenarios recompute against the submarket comp set · directional, not guaranteed
Pro · Scenario outlook

Scenario values are Pro

Bear, base and bull: price, sell-out and pace for each case.

Unlock with Pro
Common questions

Frequently asked

What does Concepto Taller De Arquitectura build?
Concepto Taller De Arquitectura works across Mixed-Use (1). See our full portfolio of 1 tracked projects above.
Where does Concepto Taller De Arquitectura build?
Active in 1 market — most projects in Miami (1). Each city links to a full local development map.
How many projects does Concepto Taller De Arquitectura have on Markets of Tomorrow?
1 project tracked — 1 active and 0 already delivered. The list rebuilds hourly from our database.
What Concepto Taller De Arquitectura projects are under construction right now?
1 project by Concepto Taller De Arquitectura are currently under construction. Each links to a live status page with milestones, renderings, and our journal coverage.
What is the biggest project in the Concepto Taller De Arquitectura pipeline?
Meliá Residences Miami at 8 floors with 110 residential units, in Miami. Status: Under Construction. See the project →
How many residential units is Concepto Taller De Arquitectura adding?
Across the active Concepto Taller De Arquitectura pipeline, the firm is adding 110 residential units across 1 active project.
Who does Concepto Taller De Arquitectura work with most often?
Frequent developers: Urban Network Capital Group, Melia Hotels Resorts, Concepto Capital Group. Each links to that firm's full project list across all markets.
How often is Concepto Taller De Arquitectura's project data updated?
Hourly. Our cron pipeline rebuilds every firm and market page from the live database every hour. A status change confirmed today shows up within ~60 minutes.
In our coverage

Recent journal posts

Pro · Concepto Taller De Arquitectura

Get the full dataset and the TMW Forecast

The part of Pro that pays for itself.Every Concepto Taller De Arquitectura project, with live status and the TMW Forecast on each one.

Start with Pro