Mirvac Construction

Contractor with 1 project in our database across 1 market.

1
Tracked
0
Announced
1
Under Construction
0
Opening Soon
0
Recently Opened
Featured projects

All 1 we’re watching

Most active markets

Brisbane
1 project

Frequent collaborators

3 projects
1 project
1 project
TMW Intelligence

Ask anything about Mirvac Construction.

Try: what's breaking ground in 2026? tallest tower in pipeline most active city

Mirvac Construction on Markets of Tomorrow

We track 1 contractor project by Mirvac Construction — 1 under construction. Most active markets: Brisbane (1). Specializing in: Residences (1).

How we built this list

Every project on this page is from our live database of new and under-construction developments worldwide. We add a project only after we can confirm it from a public filing, an official announcement, or independent reporting; status changes (breaking ground, topping out, opening) are sourced the same way and timestamped. Pro members get full access to TMW Intelligence’s prediction modeling, Dashboard data compilation, Pulse notifications, personalized notifications, comparison view, watchlists, and more.

By the numbers

The scale of the pipeline

1,000
Total residential units
across 1 project with unit data
31 floors
Tallest in pipeline
Waterfront Newstead, Brisbane
31.0 floors
Avg height
mean of 1 known
Where they're active

Markets Mirvac Construction is shaping

Common questions

Frequently asked

What does Mirvac Construction build?
Mirvac Construction works across Residences (1). See our full portfolio of 1 tracked projects above.
Where does Mirvac Construction build?
Active in 1 market — most projects in Brisbane (1). Each city links to a full local development map.
How many projects does Mirvac Construction have on Markets of Tomorrow?
1 project tracked — 1 active and 0 already delivered. The list rebuilds hourly from our database.
What Mirvac Construction projects are under construction right now?
1 project by Mirvac Construction are currently under construction. Each links to a live status page with milestones, renderings, and our journal coverage.
What is the biggest project in the Mirvac Construction pipeline?
Waterfront Newstead at 31 floors with 1,000 residential units, in Brisbane. Status: Under Construction. See the project →
How many residential units is Mirvac Construction adding?
Across the active Mirvac Construction pipeline, the firm is adding 1,000 residential units across 1 active project.
Who does Mirvac Construction work with most often?
Frequent developers: Mirvac, Mirvac Design, RPS. Each links to that firm's full project list across all markets.
How often is Mirvac Construction's project data updated?
Hourly. Our cron pipeline rebuilds every firm and market page from the live database every hour. A status change confirmed today shows up within ~60 minutes.
Pro · Mirvac Construction

Get the full dataset and the TMW Forecast

The part of Pro that pays for itself.Every Mirvac Construction project, with live status and the TMW Forecast on each one.

Start with Pro