Waterfront Newstead in Brisbane
Under Construction

Waterfront Newstead

Scroll for details
The story so far

Waterfront Newstead is Mirvac's A$1 billion residential community on the banks of the Brisbane River at Newstead, a former industrial reach of the city that the developer has been reshaping precinct by precinct into one of Brisbane's premier riverfront addresses, a 31-story tower with 1000 residences at Skyring Terrace that broke ground in August 2021 and is set to finish in November 2026.

One- to four-bedroom residences. Riverfront. The masterplan advances in named stages rather than a single delivery — Pier, Park and Unison landed first, followed by the Sky Precinct and its Quay and Isle towers, with the Shore Precinct approved to come. Mirvac Design's towers lean hard into subtropical building: Quay's 26 storeys carry more than 2,000 plants across a sculptural façade conceived as a "park within a park", and orientations are tuned to catch river breezes and northern light. Amenity across the community runs to rooftop sanctuaries with 25-metre infinity pools, hotel-inspired lobbies, private gardens attached to individual apartments, and ground-floor retail activating the riverwalk. More than 60% of the final Sky Precinct stage is given over to open space, taking the subtropical parkland delivered across that precinct alone past 8,500 square metres and handing a long stretch of restored river frontage back to the public.

Expected opening Nov 2026
Isle topped out Mid 2026

The precinct's newest tower reached structural top out with its Level 28 rooftop pergola, pool and spas installed and glazing complete.

waterfrontcommunity.mirvac.com
Isle glazing complete Jul 15, 2026

Residential glazing finished on the 28-level Isle tower and lower-level apartments moved into lock-off for defecting, with Skyring Terrace streetscape works started.

waterfrontcommunity.mirvac.com
Isle tops out Jan 2026

The 25-level, 135-residence Isle tower reached its structural top out, with the rooftop pool and spas installed.

waterfrontcommunity.mirvac.com
Topped out Jan 2026

Isle, the final residential building, reached structural top out.

waterfrontcommunity.mirvac.com
Quay completed Sep 2025

Mirvac delivered the 26-level, 135-apartment Quay tower ($204M) with more than 2,000 sq m of new public parkland, fully sold within seven months of launch; Isle, the next tower, expected to complete in FY27.

mirvac.com
Sky Stage 3 approved Feb 6, 2025

Development Application approved for the final Sky Precinct tower, 138 one- to four-bedroom apartments across 27 residential levels (31 levels total) with ground-floor retail and rooftop amenity.

waterfrontcommunity.mirvac.com
Broke ground Aug 24, 2021

Mirvac turns the first sod on $450M of Waterfront Newstead building work, LIV Anura and Quay, 538 apartments.

mirvac.com
Announced 2001

Mirvac began developing its vision for the $1b Waterfront Newstead masterplan on the former industrial riverfront in 2001.

mirvac.com
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
Amenities 9
  • Concierge
  • Conference room
  • Event space
  • Fitness center
  • Garden
  • Lap pool
  • Outdoor kitchen
  • Park
  • Pool
TMW IntelligenceVerified Nov 16, 2026
AnnouncedBreaking GroundConstructionOpening SoonNow Open

The outlook for Waterfront Newstead

Timing and similar projects, read from every development in our database.

The Brisbane market 7-project pipelineNewstead 2,935 residences and keys across the projects in our database Explore the market →
Pro tools
Compare projectsSide by side with its nearest compsAnalyze the marketModeled pricing, comps and timing

Companies and contacts

Every firm on Waterfront Newstead, the office nearest it, and the people who work on it.

Developer
Mirvac
Brisbane officePhone and email
Architect
Landscape
Sales
Mirvac
Brisbane officePhone and email
Marketing
Mirvac
Brisbane officePhone and email
Common questions

Frequently asked

Where is Waterfront Newstead located?

Waterfront Newstead is located in Brisbane.

When will Waterfront Newstead be completed?

Waterfront Newstead is under construction, with completion expected in November 2026.

Who is developing Waterfront Newstead?

Mirvac is the developer behind Waterfront Newstead.

Who designed Waterfront Newstead?

Waterfront Newstead was designed by Mirvac Design.

Who is building Waterfront Newstead?

Waterfront Newstead is being built by Mirvac Construction.