
Burswood Point
Burswood Point is a 38-hectare urban renewal district on the eastern bank of Perth's Swan River, roughly 3.5 kilometres from the CBD, developed by Golden Sedayu on the site of the former Belmont Park Racecourse, at Saintly Entrance with 4500 residences and 150 hotel keys, under way since May 2025, with full build-out in 2032.
One- to four-bedroom residences. Riverfront. A 93.9-acre site. Certified 7 Star NatHERS (Somerset). Masterplanned by Skidmore, Owings & Merrill with landscape design by Grant Associates, the $3.8 billion precinct is organised as a walkable neighbourhood of 15 buildings holding approximately 4,500 homes, hotels, retail and dining, all threaded onto a pedestrian-focused retail boulevard that runs down to the water. More than 110,000 square metres of parkland and a 2.5-kilometre public foreshore form the district's spine, with water-sensitive urban design and reimagined estuarine landscapes drawn from the Swan River's original ecology. The precinct delivers in phases over more than a decade, led by the Somerset residential towers and anchored in the longer term by Australia's first Anantara hotel. Amenity across the district runs to riverfront pools, residents' clubs, wellness facilities and a dining boulevard intended to work day and night.
The development assessment panel approves Burswood Point's third and fourth apartment buildings.
burswoodpoint.com.auThe precinct's main boulevard linking Graham Farmer Freeway and Saintly Entrance to Burswood Point is finished; Garden Homes first stage targets Q2 2027 and River Homes first stage early 2028.
businessnews.com.auGolden Sedayu reports the Somerset Residences towers 65% sold with two-bedroom homes from A$1.375 million, citing resilient buyer demand.
businessnews.com.auConstruction commenced in May 2026 on the DKO Architecture-designed River Homes, built by Urbane, while CU Building Group began the 21 Garden Homes designed by Space Collective Architects, opening the district's first ground-level housing alongside the Somerset apartment towers.
burswoodpoint.com.auTower cranes installed on Somerset East and West, the first two residential towers at Burswood Point, built by in-house Golden Sedayu Construction with completion held for Q4 2027.
businessnews.com.auAnantara signs: Minor Hotels signs the 150-key Anantara Perth Hotel at Burswood Point, the brand's Australian debut (Hotel Management, Hospitality Net).
hotelmanagement.com.au- Fitness center
- Infinity pool
- Outdoor kitchen
- Park
- Private dining
- Residents' club
- Sauna
- Spa
- Sun deck
- Yoga studio
Nearby and comparables
Within 2 miles of it, nearest first.
< 0.1 mi awaySomerset ResidencesResidencesBurswoodUnder ConstructionView projectImages coming soon0.2 mi awayAnantara Perth HotelHotelBurswood PointExpected 2032View project
0.5 mi awayEast Perth Power StationMixed-UseEast PerthAnnouncedView project
1.7 mi awayPerth HubMixed-UsePerth CBDOpened Apr 14, 2025View project
1.9 mi awayFifteen The EsplanadeMixed-UseElizabeth QuayAnnouncedView project
2.0 mi awayEQ WestResidencesElizabeth QuayUnder ConstructionView projectThe projects most like it in its market. Tap one to go head to head.
Companies and contacts
Every firm on Burswood Point, the office nearest it, and the people who work on it.
Frequently asked
Where is Burswood Point located?
Burswood Point is located in Perth.
When will Burswood Point be completed?
Burswood Point is under construction, with completion expected in 2032.
How will Burswood Point be built out?
Burswood Point is a phased, multi-component development with 2 tracked components delivering on a rolling schedule. Full build-out is expected in 2032.
Who is developing Burswood Point?
Golden Sedayu is the developer behind Burswood Point.
Who designed Burswood Point?
Burswood Point was designed by Skidmore, Owings & Merrill, with interiors by DKO.