Opening Soon

West Kowloon Station Development

Built directly over the West Kowloon High-Speed Rail Terminus, this development stitches transport, retail and workspace into a single fluid gesture beside the cultural district.

Official Website
TMW IntelligenceVerified Oct 7, 2026
AnnouncedBreaking GroundConstructionOpening SoonNow Open
2020
Start
2026
Completion
14
Floors
Scroll for details
Details

1 Wui Man Road, Hong Kong. 14 floors. Broke ground 2020, completing Q4 2026.

The story so far
Announced 2020 est.SHKP's International Gateway Centre (Zaha Hadid) atop West Kowloon HSR terminus; UBS named first anchor tenant
shkp.com
Broke ground 2020
Tenant announced Oct 10, 2022UBS named first anchor tenant, later leasing entire Tower 2B (UBS Tower)
shkp.com
Topped out 2024Structure reached roof level (Zaha Hadid-designed International Gateway Centre above West Kowloon HSR terminus) per ZHA
zaha-hadid.com
Office towers completed 2026SHKP's 2025/26 annual results say International Gateway Centre was completed during the financial year, with AXA and other financial tenants taking possession and the Stage IGC podium mall opening in phases from the end of 2026
shkp.com
TCO received Feb 3, 2026UBS Tower handed over to anchor tenant UBS 2026-02-03 (IGC office by SHKP/Zaha Hadid); backfill country/neighborhood/GFA (~2.6M office + 600k retail)
ubs.com
Resident move-in Apr 16, 2026First tenant moves in: Banco Santander held its official opening at International Gateway Centre after taking a full floor of about 37,000 sq ft, the first tenant to move into the office complex above the West Kowloon High Speed Rail terminus
shkp.com
Retail podium named Stage IGC Jul 2026SHKP unveiled the roughly 600,000 sq ft, five-level mall; an 80,000 sq ft ground floor opens on a trial basis at end-2026 and the remaining floors open progressively from Q3 2027
dimsumdaily.hk
AXA signs 97,500 sq ft lease Aug 2026AXA Hong Kong and Macau took about two and a half floors at IGC on a 10-year lease for its distribution office and wealth management hub, occupancy early 2028; tenant roster also includes Banco Santander (first to move in, April 2026), Ping An Bank, Rabobank, CCB (Asia), AIA and FWD
prnewswire.com
Expected opening Q4 2026
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
Supply pressure 5 · BalancedHong Kong marketMarket →
Compare projectsAnalyze the market
About the project

Built directly over the West Kowloon High-Speed Rail Terminus, this development stitches transport, retail and workspace into a single fluid gesture beside the cultural district. Five lower levels of retail and dining give way to two pairs of interconnected towers at the north and south ends, with expansive column-free floor plates. At its heart, a central plaza and pavilion open onto landscaped green terraces, gardens and atriums linking through to West Kowloon Parkway and the harbourfront. The signature Zaha Hadid curved geometry turns an infrastructure hub into a landmark gateway between Kowloon and the cultural quarter.

Developer & design
The Hong Kong market 5 · Balanced supplyWest Kowloon 5-project pipeline · 125 residences and keys Explore the market →
Common questions

Frequently asked

Where is West Kowloon Station Development located?

West Kowloon Station Development is located in Hong Kong.

When will West Kowloon Station Development open?

West Kowloon Station Development is opening soon, with completion expected in Q4 2026.

Who is developing West Kowloon Station Development?

Sun Hung Kai Properties is the developer behind West Kowloon Station Development.

Who designed West Kowloon Station Development?

West Kowloon Station Development was designed by Zaha Hadid Architects.

How big is West Kowloon Station Development?

West Kowloon Station Development rises 14 stories.