Announced

Fifty at First

Fifty at First is the revival of the stalled Oceanwide Center site at 50 1st Street and Mission Street in SoMa, directly across from Salesforce Tower and Salesforce Park, which the San Francisco Recovery Fund bought in January 2026 for about $60 million.

Scroll for details
Details

50 1st Street, San Francisco. 56 floors, 156 residences and 169 hotel keys. Breaks ground 2028, completing 2031.

The story so far

The formal application filed with the Planning Department in October 2026 describes a 913-foot, 56-story office tower of roughly 1.74 million square feet, with about 1.52 million square feet of office space, a 44,250-square-foot basement garage, a four-story open-box lobby behind full-height glass, and employee amenity floors on the 5th and 40th levels linked by a sky lobby, each with indoor space and an outdoor terrace. Gensler's facade is a pleated curtain wall wrapped in diagonal aluminum-panel latticework that resolves into a diamond-lattice crown; James Corner Field Operations handles the landscape, with public open space, a corner café at 1st and Stevenson and a pocket park on Mission Street, and Magnusson Klemencic Associates and MEYERS+ are structural and MEP engineers. A second phase at 528 Mission Street is drawn as a 605-foot, 54-story tower of about 636,100 square feet with 156 market-rate apartments (42 one-, 83 two- and 31 three-bedrooms), a 169-room hotel and a 2,000-square-foot restaurant. Complex-wide parking is 385 cars and 504 bicycles. BXP is development, leasing and marketing consultant, JLL the office leasing agent and SFMOMA the art consultant. Construction is estimated at about $600 million before development costs.

Expected opening 2031
Expected groundbreaking 2028
Announced Oct 2026 est.
oftmw.com
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
TMW IntelligenceVerified Oct 30, 2026
AnnouncedBreaking GroundConstructionOpening SoonNow Open

The outlook for Fifty at First

Timing and similar projects, read from every development in our database.

The San Francisco market 4-project pipelineFinancial District 7,583 residences and keys across the projects in our database Explore the market →
Pro tools
Compare projectsSide by side with any projectAnalyze the marketPricing and timing

Companies and contacts

Every firm on Fifty at First, the office nearest it, and the people who work on it.

Architect
Gensler
San Francisco officePhone and email
Common questions

Frequently asked

Where is Fifty at First located?

Fifty at First is located in San Francisco.

When will Fifty at First be built?

Fifty at First is an announced development that has not yet started construction, targeting completion in 2031.

Who is developing Fifty at First?

San Francisco Recovery Fund is the developer behind Fifty at First.

Who designed Fifty at First?

Fifty at First was designed by Gensler.

How big is Fifty at First?

Fifty at First rises 56 stories with 156 residences and 169 hotel keys.