Marsa Al Saadiyat in Abu Dhabi
Announced

Marsa Al Saadiyat

Scroll for details
The story so far

Marsa Al Saadiyat is an AED 100 billion waterfront destination master-developed by Aldar Properties as the final phase of Saadiyat Island's transformation in Abu Dhabi.

Spanning roughly 6.4 million square metres of land along an eight-kilometre waterfront, it is anchored by Abu Dhabi's largest marina, with capacity for up to 350 berths for sailing boats and luxury yachts, together with 5.6 kilometres of beaches, an extensive network of walking paths and a cycling track, and a planned Etihad Rail underground station. The community is designed for more than 58,000 residents living in private mansions, luxury villas, waterfront apartments, branded residences and a hillside enclave of standalone villas, complemented by luxury hotels, a yacht club, a retail and dining promenade, a theatre district with a major performing arts venue, schools and healthcare facilities, with a direct pedestrian connection to the Saadiyat Cultural District.

Expected opening date TBD
Expected groundbreaking 2026 est.
First-phase handovers set Sep 17, 2026

Talay (167 villas) estimated Q4 2029 and Talay Beach (184 villas) Q4 2030, priced from AED 13.5M on a 50/50 plan.

arabianbusiness.com
First homes revealed Sep 17, 2026

Aldar unveiled Talay, the first phase, with 351 villas.

zawya.com
Sales launched Sep 17, 2026

First homes launched: Aldar launched Talay, the first residential community at Marsa Al Saadiyat, with 351 standalone four- to six-bedroom villas across Talay (167) and Talay Beach (184), sales opening Sept 23 2026.

aldar.com
Talay sales Sep 2026

Aldar reported more than AED 5 billion in sales across its two September villa launches, Talay at Marsa Al Saadiyat (351 villas) and Yas Riva Reserve on Yas Island (292 villas), with overseas and expatriate buyers taking 69%; no per-project split disclosed (The National).

thenationalnews.com
Masterplan launched Jul 22, 2026

Aldar unveiled the AED100 billion, 6.4 million sq m waterfront district as master developer.

meed.com
Enabling works scheduled for Q3 2026 Jul 2026

Aldar confirmed site enabling and infrastructure works begin in the third quarter of 2026 on the AED 100bn final phase of Saadiyat Island, with sales of the first homes opening in the second half of 2026. The masterplan carries Abu Dhabi's largest marina at 350 berths, 5.6km of beach and an Etihad Rail underground station.

gulfnews.com
Announced 2026 est.

Aldar launches Marsa Al Saadiyat, an AED100 billion district across 6.4 million sq m and 8 km of Saadiyat Island waterfront with capacity for 58,000 residents, Abu Dhabi's largest marina at 350 berths and an underground Etihad Rail station.

meed.com
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
TMW IntelligenceVerified Nov 13, 2026
AnnouncedBreaking GroundConstructionOpening SoonNow Open

The outlook for Marsa Al Saadiyat

Timing and similar projects, read from every development in our database.

The Abu Dhabi market 10-project pipelineSaadiyat Island 7,550 residences and keys across the projects in our database Explore the market →
Pro tools
Compare projectsSide by side with its nearest compsAnalyze the marketModeled pricing, comps and timing

Companies and contacts

Every firm on Marsa Al Saadiyat, the office nearest it, and the people who work on it.

Project website
Developer
Common questions

Frequently asked

Where is Marsa Al Saadiyat located?

Marsa Al Saadiyat is located in Abu Dhabi.

When will Marsa Al Saadiyat be built?

Marsa Al Saadiyat is an announced development that has not yet started construction.

Who is developing Marsa Al Saadiyat?

Aldar Properties is the developer behind Marsa Al Saadiyat.