The Tampa EDITION in Tampa
Now Open

The Tampa EDITION

Scroll for details
The story so far

The Tampa EDITION is a 172-room hotel in the Water Street Tampa district, developed by Strategic Property Partners and operated under the Marriott EDITION brand created with Ian Schrager, at 500 Channelside Drive, open since 2022.

It opened in 2022 as Tampa's first five-star hotel and shares a tower with private residences. The hotel faces the downtown waterfront and Channelside Bay. Amenities include a rooftop pool and several restaurants and bars.

Opened 2022
Announced 2022 est.
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
TMW IntelligenceVerified Nov 14, 2026
AnnouncedBreaking GroundConstructionOpening SoonNow Open

Looking back at The Tampa EDITION

Opened in 2022. Compare it with similar projects from every development in our database.

The Tampa market 25-project pipelineWater Street Tampa 16,507 residences and keys across the projects in our database Explore the market →
Pro tools
Compare projectsSide by side with its nearest compsAnalyze the marketModeled pricing, comps and timing

Companies and contacts

Every firm on The Tampa EDITION, the office nearest it, and the people who work on it.

Project website
Common questions

Frequently asked

Where is The Tampa EDITION located?

The Tampa EDITION is located in Tampa.

Is The Tampa EDITION open?

The Tampa EDITION is now open. It was completed in 2022.

How big is The Tampa EDITION?

The Tampa EDITION features 172 hotel keys.