Under Construction

Waldorf Astoria Residences Denver Cherry Creek

Denver · Residences

Waldorf Astoria Residences Denver Cherry Creek is Colorado's first Waldorf Astoria-branded residential address, a boutique luxury condominium at 185 North Steele Street in the heart of Cherry Creek North.

Official Website
Verified Sep 26, 2026~18 months to delivery
AnnouncedBreaking GroundConstructionOpening SoonNow Open
11.19.25
Start
2028
Completion
37
Units
5
Floors

Financed with $107.5M from Maxim Capital Group in 08.25.

Scroll for details
Details

185 N Steele Street, Denver. 5 floors and 37 residences. Broke ground Nov 2025, completing Q1 2028. Financed with $107.5M from Maxim Capital Group in Aug 2025.

The story so far
Announced Jul 2024First-ever Waldorf Astoria Residences announced for Cherry Creek North (PMG), 2024-07
milehighcre.com
Financing secured Aug 2025$107.5M construction loan from Maxim Capital Group (Aug 2025 per Bisnow); completion targeted Q1 2028 per Denver Gazette/Mile High CRE
bisnow.com
Sales launched Nov 202565% of condos sold ahead of groundbreaking
denvergazette.com
Broke ground Nov 19, 2025PMG breaks ground on Waldorf Astoria Residences Cherry Creek with ~65% of condos pre-sold, 2025-11-19
milehighcre.com
Going vertical Nov 19, 2025PMG broke ground / began vertical construction at 185 N. Steele St, Cherry Creek North (65% pre-sold)
milehighcre.com
Tower crane up Apr 2026GC Hyder Construction raised its tower crane at 185 N Steele St after completing shoring and mass excavation, with concrete foundations underway for the 5-story, 37-residence building
hyderinc.com
Foundation wraps and the structure turns vertical Aug 2026Hyder Construction placed more than 1,200 cubic yards of structural concrete in eight days, including a 650-cubic-yard slab-on-deck pour, as slab-on-grade work finished at 185 N Steele Street
constructionowners.com
Expected opening Q1 2028
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
Supply pressure 47 · ElevatedDenver marketMarket →
Compare projectsAnalyze the market
About the project

Waldorf Astoria Residences Denver Cherry Creek is Colorado's first Waldorf Astoria-branded residential address, a boutique luxury condominium at 185 North Steele Street in the heart of Cherry Creek North. Developed by PMG with architecture by Shears Adkins Rockmore and Carlos Ott and interiors by BAMO, the building holds 37 full- and half-floor condominiums served by Waldorf Astoria's signature hotel-style concierge, doorman, and bellman service, managed by Hilton. Residents enjoy a street-level signature restaurant, rooftop amenities, and curated wellness and lifestyle programming in one of Denver's most walkable luxury retail districts.

Developer & design
The Denver market 47 · Elevated supplyCherry Creek North 6-project pipeline · 930 residences and keys · peak Late ’26 Explore the market →
Common questions

Frequently asked

Where is Waldorf Astoria Residences Denver Cherry Creek located?

Waldorf Astoria Residences Denver Cherry Creek is located in Denver.

When will Waldorf Astoria Residences Denver Cherry Creek be completed?

Waldorf Astoria Residences Denver Cherry Creek is under construction, with completion expected in Q1 2028.

Who is developing Waldorf Astoria Residences Denver Cherry Creek?

PMG is the developer behind Waldorf Astoria Residences Denver Cherry Creek.

Who designed Waldorf Astoria Residences Denver Cherry Creek?

Waldorf Astoria Residences Denver Cherry Creek was designed by Shears Adkins Rockmore & More.

How big is Waldorf Astoria Residences Denver Cherry Creek?

Waldorf Astoria Residences Denver Cherry Creek rises 5 stories with 37 residences.