Waldorf Astoria Residences Denver Cherry Creek in Denver
Under Construction

Waldorf Astoria Residences Denver Cherry Creek

Scroll for details
The story so far

Waldorf Astoria Residences Denver Cherry Creek is Colorado's first Waldorf Astoria-branded residential address, a boutique luxury condominium at 185 North Steele Street in the heart of Cherry Creek North, a 5-story building with 37 residences that broke ground in November 2025 and is set to finish in Q1 2028. Financed with $107.5M from Maxim Capital in August 2025.

Private elevators. Developed by PMG with architecture by Shears Adkins Rockmore and Carlos Ott and interiors by BAMO, the building holds 37 full- and half-floor condominiums served by Waldorf Astoria's signature hotel-style concierge, doorman, and bellman service, managed by Hilton. Residents enjoy a street-level signature restaurant, rooftop amenities, and curated wellness and lifestyle programming in one of Denver's most walkable luxury retail districts.

Expected opening Q1 2028
Foundation wraps and the structure turns vertical Aug 2026

Hyder Construction placed more than 1,200 cubic yards of structural concrete in eight days, including a 650-cubic-yard slab-on-deck pour, as slab-on-grade work finished at 185 N Steele Street.

constructionowners.com
Foundation pours May 28, 2026

First pour completed April 9 and largest pour May 28, 2026, Hyder Construction building.

milehighcre.com
Tower crane up Apr 2026

GC Hyder Construction raised its tower crane at 185 N Steele St after completing shoring and mass excavation, with concrete foundations underway for the 5-story, 37-residence building.

hyderinc.com
Going vertical Nov 19, 2025

PMG broke ground / began vertical construction at 185 N. Steele St, Cherry Creek North (65% pre-sold).

milehighcre.com
Broke ground Nov 19, 2025

PMG breaks ground on Waldorf Astoria Residences Cherry Creek with ~65% of condos pre-sold, Nov 19, 2025.

milehighcre.com
Sales launched Nov 2025

65% of condos sold ahead of groundbreaking.

denvergazette.com
Financing secured Aug 2025

$107.5M construction loan from Maxim Capital Group (Aug 2025; completion targeted Q1 2028.

bisnow.com
Announced Jul 2024

First-ever Waldorf Astoria Residences announced for Cherry Creek North (PMG), 2024-07.

milehighcre.com
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
Amenities 19
  • Bar
  • Cold plunge
  • Concierge
  • Doorman
  • EV charging
  • Fitness center
  • Hotel services
  • Housekeeping
Show all 19Show fewer
  • Package room
  • Private elevators
  • Residents' club
  • Restaurant
  • Rooftop pool
  • Sauna
  • Security
  • Steam room
  • Storage
  • Sun deck
  • Valet
TMW IntelligenceVerified Nov 8, 2026
AnnouncedBreaking GroundConstructionOpening SoonNow Open

The outlook for Waldorf Astoria Residences Denver Cherry Creek

Timing and similar projects, read from every development in our database.

The Denver market 6-project pipelineCherry Creek North 931 residences and keys across the projects in our database Explore the market →
Pro tools
Compare projectsSide by side with its nearest compsAnalyze the marketModeled pricing, comps and timing

Companies and contacts

Every firm on Waldorf Astoria Residences Denver Cherry Creek, the office nearest it, and the people who work on it.

Architect
Carlos Ott
Montevideo, Uruguay office head officePhone and email
Interior design
BAMO
San Francisco officePhone and email
Common questions

Frequently asked

Where is Waldorf Astoria Residences Denver Cherry Creek located?

Waldorf Astoria Residences Denver Cherry Creek is located in Denver.

When will Waldorf Astoria Residences Denver Cherry Creek be completed?

Waldorf Astoria Residences Denver Cherry Creek is under construction, with completion expected in Q1 2028.

Who is developing Waldorf Astoria Residences Denver Cherry Creek?

Property Markets Group is the developer behind Waldorf Astoria Residences Denver Cherry Creek.

Who designed Waldorf Astoria Residences Denver Cherry Creek?

Waldorf Astoria Residences Denver Cherry Creek was designed by Shears Adkins Rockmore, Carlos Ott, with interiors by BAMO.

Who is building Waldorf Astoria Residences Denver Cherry Creek?

Waldorf Astoria Residences Denver Cherry Creek is being built by Hyder Construction.