Barton Malow

Contractor with 1 project in our database across 1 market.

1
Tracked
0
Announced
0
Under Construction
1
Opening Soon
0
Recently Opened
Featured projects

All 1 we’re watching

Most active markets

Detroit
1 project

Frequent collaborators

TMW Intelligence

Ask anything about Barton Malow.

Try: what's breaking ground in 2026? tallest tower in pipeline most active city

Barton Malow on Markets of Tomorrow

We track 1 contractor project by Barton Malow — 0 under construction. Most active markets: Detroit (1). Specializing in: Mixed-Use (1).

How we built this list

Every project on this page is from our live database of new and under-construction developments worldwide. We add a project only after we can confirm it from a public filing, an official announcement, or independent reporting; status changes (breaking ground, topping out, opening) are sourced the same way and timestamped. Pro members get full access to TMW Intelligence’s prediction modeling, Dashboard data compilation, Pulse notifications, personalized notifications, comparison view, watchlists, and more.

By the numbers

The scale of the pipeline

96
Total residential units
across 1 project with unit data
227
Total hotel keys
across tracked hotels
45 floors
Tallest in pipeline
Hudson's Detroit, Detroit
45.0 floors
Avg height
mean of 1 known
2027
Delivery window
all projects same year
Where they're active

Markets Barton Malow is shaping

Common questions

Frequently asked

What does Barton Malow build?
Barton Malow works across Mixed-Use (1). See our full portfolio of 1 tracked projects above.
Where does Barton Malow build?
Active in 1 market — most projects in Detroit (1). Each city links to a full local development map.
How many projects does Barton Malow have on Markets of Tomorrow?
1 project tracked — 1 active and 0 already delivered. The list rebuilds hourly from our database.
What Barton Malow projects are opening soon?
1 project by Barton Malow are flagged Opening Soon — expected to open within ~7 months. Pro members get the TMW Forecast on every project as forecasts shift.
What is the biggest project in the Barton Malow pipeline?
Hudson's Detroit at 45 floors with 96 residential units, in Detroit. Status: Opening Soon. See the project →
How many residential units is Barton Malow adding?
Across the active Barton Malow pipeline, the firm is adding 96 residential units across 1 active project.
Who does Barton Malow work with most often?
Frequent developers: Bedrock Detroit, SHoP Architects, Yabu Pushelberg. Each links to that firm's full project list across all markets.
How often is Barton Malow's project data updated?
Hourly. Our cron pipeline rebuilds every firm and market page from the live database every hour. A status change confirmed today shows up within ~60 minutes.
Pro · Barton Malow

Get the full dataset and the TMW Forecast

The part of Pro that pays for itself.Every Barton Malow project, with live status and the TMW Forecast on each one.

Start with Pro