
Greater Sentosa Master Plan is under way since November 2024, with full build-out in 2045.
Beachfront. A 1532-acre site. Certified GSTC-D certified destination (first island destination in Asia). The Greater Sentosa Master Plan is the Sentosa Development Corporation's long-horizon rebuild of Singapore's resort island, extending the 5-square-kilometre island across the water to absorb the 120-hectare Pulau Brani, whose container port is being progressively decommissioned and handed over for leisure use. First unveiled as the Sentosa-Brani Master Plan, the scheme is structured as a phased build-out rather than a single opening, layering new hotels, attractions and entertainment districts onto an island best known today for its beaches, Resorts World Sentosa and a cluster of ageing 1970s-era draws. Coastal trails and improved transport links are designed to stitch the two islands into one continuous destination, replacing the current pattern of isolated attractions reached by shuttle with a walkable, connected shoreline, while the beaches themselves are being rejuvenated and reshaped. Brani in particular offers something rare in land-scarce Singapore: a large, contiguous, undeveloped waterfront parcel within sight of the CBD skyline. The stated ambition is to roughly double the island's visitor numbers from the current level of about 17 million a year, repositioning Sentosa against regional resort competitors rather than purely as a domestic day-trip destination.
A new Sentosa-Brani transport hub, a replacement for the Sentosa Express monorail, the Imbiah Canopy landmark on Mount Imbiah, beach rejuvenation with coastal protection and expanded nature and heritage trails (Time Out Singapore).
timeout.comThe Sentosa Development Corporation's twenty-year plan aims to roughly double annual visitors to about 32 million, adding the Imbiah Canopy, Imbiah Lookout Walk and Sensorium, an islet-hopping beach experience with new sunrise and sunset beach clubs, and an Island Heart Transport Hub served by a new People Mover System.
ttgasia.comSentosa Development Corporation set out a 620-hectare vision folding the 120-hectare Pulau Brani into the island, anchored by the Imbiah Canopy, the Imbiah Lookout Walk, an indoor attractions venue called Sensorium, rebuilt beaches and a new Island Heart Transport Hub.
sentosa.gov.sgSentosa Development Corporation unveiled the Greater Sentosa Master Plan, a 20-year transformation integrating the 120-hectare Pulau Brani with Sentosa, new icons including the Sensorium, reimagined Siloso, Palawan and Tanjong beaches, and Brani's conversion once its port terminal moves to Tuas by 2027.
sentosa.gov.sgThe outlook for Greater Sentosa Master Plan
Timing and similar projects, read from every development in our database.
Nearby and comparables
The closest projects to it, nearest first.
0.6 mi awayCapella SingaporeHotelSentosaOpened 2009View project
0.8 mi awayResorts World Sentosa, SingaporeEntertainmentSentosaExpected 2030View project
1.9 mi awayNewport ResidencesResidencesTanjong PagarUnder ConstructionView project
2.2 mi awayThe SkywatersMixed-UseTanjong PagarExpected 2028View project
2.2 mi awayAman SingaporeMixed-UseTanjong PagarExpected 2028View project
2.3 mi awayW Residences Marina ViewResidencesMarina BayUnder ConstructionView project
3.2 mi awayMarina Bay Sands ExpansionMixed-UseMarina BayExpected Jan 2031View project
3.2 mi awayRiver ModernResidencesRiver ValleyUnder ConstructionView project
3.7 mi awayThe Hari SingaporeHotelOrchardUnder ConstructionView project
3.8 mi awayNoMad SingaporeHotelOrchardOpens Dec 1, 2026View projectThe projects most like it in its market. Tap one to go head to head.
Companies and contacts
Every firm on Greater Sentosa Master Plan, the office nearest it, and the people who work on it.
Frequently asked
Where is Greater Sentosa Master Plan located?
Greater Sentosa Master Plan is located in Singapore.
When will Greater Sentosa Master Plan be completed?
Greater Sentosa Master Plan is breaking ground, with completion targeted in 2045.
How will Greater Sentosa Master Plan be built out?
Greater Sentosa Master Plan is a phased, multi-component development with 1 tracked component delivering on a rolling schedule. Full build-out is expected in 2045.
Who is developing Greater Sentosa Master Plan?
Sentosa Development Corporation is the developer behind Greater Sentosa Master Plan.
Who designed Greater Sentosa Master Plan?
Greater Sentosa Master Plan was designed by Grant Associates & More.