Under Construction

PGA Office Center

Palm Beach Gardens · Office

This 86-acre corporate campus at I-95 and PGA Boulevard in Palm Beach Gardens comprises twin six-story office buildings — Phase 1 at 266,000 square feet (opened 2022) and Phase 2 at 249,000 square feet (approved December 2022) — connected by a glass-enclosed walkway and supported by twin…

Last verified Jul 14, 2026
17 months to delivery
52%
AnnouncedBreaking GroundConstructionOpening SoonNow Open
2020
Start
Est 2027
Completion
6
Floors
Scroll for details
The story so far
Announced 2019Palm Beach Gardens City Council approves Phase 1: 266,000 sqft six-story FPL office building + garage on 86-acre I-95/PGA Blvd campus
ongardens.org
Broke ground 2020
Under construction 2020First FPL office building began vertical construction in 2020 (opened 2023); second twin building still in planning
wptv.com
Expected opening 2027 est.
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
About the project

This 86-acre corporate campus at I-95 and PGA Boulevard in Palm Beach Gardens comprises twin six-story office buildings — Phase 1 at 266,000 square feet (opened 2022) and Phase 2 at 249,000 square feet (approved December 2022) — connected by a glass-enclosed walkway and supported by twin three-story parking garages with 150 EV charging stations and a rooftop solar photovoltaic array. The site includes a helistop, a 3,000-gallon emergency fuel station for company vehicles during storms, native plantings across 90 percent of the landscape, and is engineered to withstand Category 5 hurricanes for operational continuity. The original 2013 zoning approval cleared up to one million square feet of office development across the site, leaving roughly half a million square feet of future capacity beyond the two completed phases — enough for another 2,000 employees.

Common questions

Frequently asked

Where is PGA Office Center located?

PGA Office Center is located in Palm Beach Gardens.

When will PGA Office Center be completed?

PGA Office Center is under construction, with completion expected in 2027 (a TMW estimate).

Who is developing PGA Office Center?

Florida Power & Light, NextEra Energy is the developer behind PGA Office Center.

Who designed PGA Office Center?

PGA Office Center was designed by Perkins&Will, Urban Design Studio.

How big is PGA Office Center?

PGA Office Center rises 6 stories.