Under Construction

PGA Office Center

Palm Beach Gardens · Office

PGA Office Center is Florida Power & Light and NextEra Energy's 86-acre corporate office campus at Interstate 95 and PGA Boulevard in the PGA Station area of Palm Beach Gardens, Florida.

Verified Sep 19, 2026~15 months to delivery
AnnouncedBreaking GroundConstructionOpening SoonNow Open
2020
Start
~2027
Completion
6
Floors
Scroll for details
Details

4299 Kyoto Gardens Drive, Palm Beach Gardens. 6 floors. Broke ground 2020, targeting 2027.

The story so far
Announced 2019Palm Beach Gardens City Council approves Phase 1: 266,000 sqft six-story FPL office building + garage on 86-acre I-95/PGA Blvd campus
ongardens.org
Broke ground 2020
Under construction 2020First FPL office building began vertical construction in 2020 (opened 2023); second twin building still in planning
wptv.com
Phase 2 under construction Nov 2025Stet News reports FPL's second six-story office building is under construction beside the first, with FPL paying nearly $1M in mobility fees tied to Kyoto Gardens Drive road widening
stetnews.org
Expected opening 2027 est.
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
Supply pressure 66 · ElevatedPalm Beach Gardens marketMarket
Compare projectsAnalyze the market
About the project

PGA Office Center is Florida Power & Light and NextEra Energy's 86-acre corporate office campus at Interstate 95 and PGA Boulevard in the PGA Station area of Palm Beach Gardens, Florida. Designed by Perkins&Will with Urban Design Studio, the campus pairs twin six-story Class A office buildings: a 266,000-square-foot first building already occupied by roughly 1,000 employees and a 249,000-square-foot second building, now under construction along Kyoto Gardens Drive, that will house about 1,000 more. The two towers connect through a glass-enclosed walkway and are served by twin three-story parking garages with 150 electric vehicle charging stations and a rooftop solar photovoltaic array. The site includes a helistop and an emergency fuel station that keeps company vehicles running through storms, native plantings across roughly 90 percent of the landscape, and construction engineered to withstand Category 5 hurricanes for operational continuity. Existing zoning clears up to one million square feet of office on the site, leaving capacity for a possible third building.

The Palm Beach Gardens market 66 · Elevated supplyPGA Station 7-project pipeline · 798 residences and keys · peak Late ’26 Explore the market →
Common questions

Frequently asked

Where is PGA Office Center located?

PGA Office Center is located in Palm Beach Gardens.

When will PGA Office Center be completed?

PGA Office Center is under construction, with completion expected in 2027 (a TMW estimate).

Who is developing PGA Office Center?

Florida Power & Light, NextEra Energy is the developer behind PGA Office Center.

Who designed PGA Office Center?

PGA Office Center was designed by Perkins&Will, Urban Design Studio.

How big is PGA Office Center?

PGA Office Center rises 6 stories.