W Residences at Dubai Harbour in Dubai
Under Construction

W Residences at Dubai Harbour

Scroll for details
The story so far

W Residences at Dubai Harbour brings Marriott's W brand to one of Dubai's newest waterfront districts in three slender 40-storey towers rising from a single landscaped podium, with 490 residences, under way since February 2026 and set to finish in 2028.

One- to five-bedroom residences up to 1,072 square feet. With a private beach. Certified LEED-certified design (target). Arada is building around 490 branded homes, from one-bedroom apartments to duplexes and rooftop penthouses with private pools, all with floor-to-ceiling glass framing Palm Jumeirah, Bluewaters and Ain Dubai, and the Arabian Gulf. The podium is the social engine of the project: a roughly 200-metre infinity pool billed as the longest in Dubai, a 40,000-square-foot Wellfit fitness and wellness club, a music recording studio, a sports simulator, a cinema, co-working space, guest suites and dining outlets, with residents served by W's signature concierge and lifestyle programming. The towers sit between the Dubai Harbour marina and the beachfront communities of Emaar Beachfront and Sobha SeaHaven, a short walk from the cruise terminal and the Dubai Marina promenade. The building is designed to LEED Silver standards.

Expected opening 2028
Main contract awarded Feb 2026

Arada awarded the ~AED1.5bn ($408M) main construction contract for all three towers to Engineering Contracting Company.

meed.com
Under construction Feb 2026

Arada awarded the AED1.55bn main construction contract for all three towers; excavation and piling under an AED51M APCC enabling contract already underway (also Zawya, MEED).

meconstructionnews.com
Broke ground Feb 2026
Sales launched Oct 22, 2024

Sales launched with the Oct 22, 2024 unveiling: 400+ W-branded apartments, one-bed to five-bed rooftop penthouses with pools, now on sale.

arada.com
Announced 2024 est.

Arada launched the AED5bn, three-tower, 40-storey W Residences at Dubai Harbour with Marriott, 400+ branded homes, 2027 completion.

arada.com
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
Amenities 10
  • Fitness center
  • Garden
  • Infinity pool
  • Kids club
  • Outdoor kitchen
  • Park
  • Pool
  • Restaurant
  • Security
  • Valet
TMW IntelligenceVerified Nov 16, 2026
AnnouncedBreaking GroundConstructionOpening SoonNow Open

The outlook for W Residences at Dubai Harbour

Timing and similar projects, read from every development in our database.

The Dubai market 51-project pipelineDubai Harbour 31,763 residences and keys across the projects in our database Explore the market →
Pro tools
Compare projectsSide by side with its nearest compsAnalyze the marketModeled pricing, comps and timing

Nearby and comparables

Companies and contacts

Every firm on W Residences at Dubai Harbour, the office nearest it, and the people who work on it.

Project website
Developer
Common questions

Frequently asked

Where is W Residences at Dubai Harbour located?

W Residences at Dubai Harbour is located in Dubai.

When will W Residences at Dubai Harbour be completed?

W Residences at Dubai Harbour is under construction, with completion expected in 2028.

Who is developing W Residences at Dubai Harbour?

Arada is the developer behind W Residences at Dubai Harbour.

Who is building W Residences at Dubai Harbour?

W Residences at Dubai Harbour is being built by Engineering Contracting Co. (LLC).

How big is W Residences at Dubai Harbour?

W Residences at Dubai Harbour rises 40 stories with 490 residences.