Breaking Ground

Eastpoint

Nashville · Mixed-Use
Part of East Bank →

Parcel C of Eastpoint is the gateway phase of a 30-acre East Bank neighborhood rising directly across the Cumberland River from downtown Nashville, adjacent to the new Nissan Stadium and the future Tennessee Performing Arts Center.

Official Website
Last verified Jul 13, 2026
3.4 yrs to delivery
23%
AnnouncedBreaking GroundConstructionOpening SoonNow Open
05.28.26
Start
2029
Completion
Scroll for details
The story so far
Announced May 9, 2026
oftmw.com
Broke ground May 28, 2026Fallon Company and Elmington Capital broke ground on Eastpoint Flats — the first building (323 affordable units) in the 30-acre East Bank district
oftmw.com
Financing secured Jun 2026$80M construction loan closed for Eastpoint Flats (first building of the East Bank Eastpoint district, Fallon/Elmington), per Connect CRE; bank lender undisclosed
connectcre.com
Expected opening 2029
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
About the project

Parcel C of Eastpoint is the gateway phase of a 30-acre East Bank neighborhood rising directly across the Cumberland River from downtown Nashville, adjacent to the new Nissan Stadium and the future Tennessee Performing Arts Center. The plan centers on a 1.5-acre public plaza framed by approximately 50,000 square feet of multi-level retail and restaurant space, tree-lined sidewalks, dedicated bike lanes, and below-ground parking that lifts pedestrian life to the street level. Above it, the parcel will deliver a 600-room full-service hotel alongside a residential component with 10% set aside as affordable housing — designed to serve full-time residents while absorbing the crowds drawn to the stadium and TPAC across the year.

The Nashville market 93 · Saturated supplyEast Bank 23-project pipeline · 4,080 residences and keys · peak Late ’27 Explore the market →
Common questions

Frequently asked

Where is Eastpoint located?

Eastpoint is located in Nashville, part of East Bank.

When will Eastpoint be completed?

Eastpoint is breaking ground, with completion targeted in 2029.

Who is developing Eastpoint?

The Fallon Company is the developer behind Eastpoint.

Who designed Eastpoint?

Eastpoint was designed by HKS & More.