The Royal Diriyah Opera House is the cultural landmark of Diriyah Gate's second phase, designed by Snøhetta as a 46,000 square metre performing arts centre that reinterprets Najdi building traditions in palm, stone and rammed earth, with a stepped massing of terraces and shaded public spaces.
Broke ground April 2025, targeting 2028.
The outlook for Royal Diriyah Opera House
Timing and similar projects, read from every development in our database.
The Royal Diriyah Opera House is the cultural landmark of Diriyah Gate's second phase, designed by Snøhetta as a 46,000 square metre performing arts centre that reinterprets Najdi building traditions in palm, stone and rammed earth, with a stepped massing of terraces and shaded public spaces. It holds a 2,000-seat main theatre, the largest in Saudi Arabia, two 450-seat theatres and a 450-seat rooftop amphitheatre, for a total capacity of roughly 3,100 to 3,500. Diriyah Company signed the SAR 5.1 billion construction contract with a joint venture of El Seif Engineering, China State Construction Engineering and Midmac, a package that also covers a five-star hotel and a mixed-use residential complex in the opera district. Pin is approximate within Diriyah phase 2.
Companies and contacts
Every firm on Royal Diriyah Opera House, the office nearest it, and the people who work on it.
Frequently asked
Where is Royal Diriyah Opera House located?
Royal Diriyah Opera House is located in Riyadh, part of Diriyah Gate.
When will Royal Diriyah Opera House be completed?
Royal Diriyah Opera House is under construction, with completion expected in 2028 (a TMW estimate).
Who is developing Royal Diriyah Opera House?
Diriyah Company is the developer behind Royal Diriyah Opera House.
Who designed Royal Diriyah Opera House?
Royal Diriyah Opera House was designed by Snøhetta.