Under Construction

Paseo South Gulch

Nashville · Mixed-Use

Paseo South Gulch is SomeraRoad's more than $1 billion, phased mixed-use development on roughly 2.6 acres at 620 8th Avenue South, in the node where Nashville's Gulch and Pie Town overlap.

Official Website
Verified Sep 27, 2026~2.3 yrs to delivery
AnnouncedBreaking GroundConstructionOpening SoonNow Open
Delivers in phases · 1 component
2021
Start
2028
Full build-out
180
Keys
824
Units
30
Floors
Scroll for details
Details

620 8th Avenue South, Nashville. 30 floors, 824 residences and 180 hotel keys. Broke ground 2021, full build-out 2028.

The story so far
Announced 2021 est.
Broke ground 2021
Tenant announced 2026Nashville's first Equinox is under construction at SomeraRoad's $1B Paseo South Gulch, joining open tenants including The Catbird Seat, Patterson House and Carter Vintage Guitars
oftmw.com
Under construction
Expected opening 2028
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
Supply pressure 91 · SaturatedNashville marketMarket →
Compare projectsAnalyze the market
About the project

Paseo South Gulch is SomeraRoad's more than $1 billion, phased mixed-use development on roughly 2.6 acres at 620 8th Avenue South, in the node where Nashville's Gulch and Pie Town overlap. The master plan, shaped by ESa and Manuel Zeitlin Architects, weaves a cluster of new high-rises around two restored historic structures: the Bill Voorhees Company Building, updated with new systems and a glass rooftop addition atop roughly 58,000 square feet, and the former Downtown Antique Mall, an adaptive-reuse retail building. Phase one delivered Prima, a tower with 278 apartments and office space, which opened in 2025. A 30-story mixed-use tower brings the Pendry Nashville hotel and branded residences, with 180 keys, 146 condominiums, restaurants and a pool bar. A final phase is planned to add roughly 385,000 square feet of Class A office space and another residential tower of more than 400 units, alongside 18,000 square feet of office and 14,000 square feet of retail woven through the district's interconnected walkways and terraces. The name Paseo references those pedestrian promenades and the development's emphasis on outdoor programming and walkability.

Developer & design
The Nashville market 91 · Saturated supplyThe Gulch 27-project pipeline · 11,849 residences and keys · peak Late ’27 Explore the market →
Inside this development
1 direct component.
Common questions

Frequently asked

Where is Paseo South Gulch located?

Paseo South Gulch is located in Nashville.

When will Paseo South Gulch be completed?

Paseo South Gulch is under construction, with completion expected in 2028.

How will Paseo South Gulch be built out?

Paseo South Gulch is a phased, multi-component development with 1 tracked component delivering on a rolling schedule. Full build-out is expected in 2028.

Who is developing Paseo South Gulch?

SomeraRoad is the developer behind Paseo South Gulch.

Who designed Paseo South Gulch?

Paseo South Gulch was designed by ESa, Manuel Zeitlin Architects.