Under Construction

Róng Museum of Art

Shenzhen · Museum

Designed by Büro Ole Scheeren for Tenova Future, the Róng Museum of Art rises in Shenzhen's Nanshan District as a composition of floating, cavernous gallery volumes wrapped in shimmering, softly reflective facades.

Last verified Jul 7, 2026
18 months to delivery
45%
AnnouncedBreaking GroundConstructionOpening SoonNow Open
2027
Completion
Scroll for details
The story so far
Announced Mar 23, 2026Büro Ole Scheeren publicly unveiled the Róng Museum of Art (patron Tenova Future / Ma Huateng) — earliest sourceable public reveal. HIGH.
dezeen.com
Under construction
Expected opening 2027
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
About the project

Designed by Büro Ole Scheeren for Tenova Future, the Róng Museum of Art rises in Shenzhen's Nanshan District as a composition of floating, cavernous gallery volumes wrapped in shimmering, softly reflective facades. Dedicated to the visual and digital culture of the 20th and 21st centuries — art, design, architecture and film — it serves as the cultural heart of the Houhai Hybrid Campus, a larger mixed-use development of curvilinear towers linked by elevated promenades around a central oasis. Deep, stacked interior halls and a sculpted public realm are conceived to draw the city inside, positioning the museum as a landmark where technology and contemporary culture meet.

Developer & design
Common questions

Frequently asked

Where is Róng Museum of Art located?

Róng Museum of Art is located in Shenzhen.

When will Róng Museum of Art be completed?

Róng Museum of Art is under construction, with completion expected in 2027.

Who is developing Róng Museum of Art?

Tenova Future is the developer behind Róng Museum of Art.

Who designed Róng Museum of Art?

Róng Museum of Art was designed by Büro Ole Scheeren.