Announced

Parcel C1 Hotel

Part of Eastpoint →

The Parcel C1 hotel is the 600-key full-service anchor of The Fallon Company's 30-acre Eastpoint district on Nashville's East Bank, rising beside the new Nissan Stadium and designed by HKS.

Scroll for details
Details

600 hotel keys. Breaks ground October 2027, completing December 2030.

The story so far

The plan includes 75 suites, 20,000 square feet of retail and 35,000 square feet of event space, an outdoor terrace with a pool on the fourth level, three levels of underground parking with about 500 spaces, and a distinctive structural element at the top of the building housing a food and beverage concept. Brasfield & Gorrie is the general contractor. The hotel brand, a public company, has not yet been announced, and Metro must deliver water, sewer, electric and gas infrastructure before construction can begin. At 600 rooms it would rank as the third-largest hotel in downtown Nashville.

Expected opening Dec 2030
Expected groundbreaking Oct 2027
Announced May 9, 2026
oftmw.com
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
TMW IntelligenceVerified Oct 29, 2026
AnnouncedBreaking GroundConstructionOpening SoonNow Open

The outlook for Parcel C1 Hotel

Timing and similar projects, read from every development in our database.

The Nashville market 29-project pipelineEast Bank 12,456 residences and keys across the projects in our database Explore the market →
Pro tools
Compare projectsSide by side with any projectAnalyze the marketPricing and timing

Companies and contacts

Every firm on Parcel C1 Hotel, the office nearest it, and the people who work on it.

Developer
Architect
Part of Eastpoint
Parcel C1 Hotel is one of 1 connected project in this development.
Common questions

Frequently asked

Where is Parcel C1 Hotel located?

Parcel C1 Hotel is located in Nashville, part of Eastpoint.

When will Parcel C1 Hotel be built?

Parcel C1 Hotel is an announced development that has not yet started construction, targeting completion in December 2030.

Who is developing Parcel C1 Hotel?

The Fallon Company is the developer behind Parcel C1 Hotel.

Who designed Parcel C1 Hotel?

Parcel C1 Hotel was designed by HKS.

How big is Parcel C1 Hotel?

Parcel C1 Hotel features 600 hotel keys.